Mediplex Abington MOB







Axis was hired by a private medical developer to complete the construction of a 22,000 sqf MOB in Abington, PA. This two story out of the ground MOB houses four separate specialty medical tenants.
Project Fast Facts
- Axis was hired by a private medical developer to complete the construction of a 22,000 sqf MOB in Abington, PA. This two story out of the ground MOB houses four separate specialty medical tenants.
- Gross Size:22000 ft 2
- Start Date:June 4, 2019
- End Date:May 14, 2020
- Status:Completed
- Client Name:Private Medical Developer