Penn Medicine Tuttleman Center





4th Floor Pre Op/2nd Stage Recovery (Occupied Renovation. ICRA level 3), 4th Floor Waiting Area (Occupied Renovation. ICRA Level 3), 5th Floor OR 1 &2 (Occupied Renovation. ICRA Level 4).
Construct ICRA compliant partitions, and negative air.
Removal of all existing millwork, flooring, wall finishes, ceiling tiles, lighting, plumbing fixtures
Installation of all new flooring, millwork, LED light fixtures, plumbing fixtures.
Construct ICRA compliant partitions, and negative air.
Removal of all existing millwork, flooring and wall finishes
1000 sf renovation of 2 existing OR’s on an occupied sterile Operating Room Floor
Construct ICRA compliant partitions, and negative air.
Removal of all ceilings, millwork, flooring, wall finishes, equipment, electrical, plumbing, HVAC, Med Gas, sprinkler
Provide all new electrical feeds to new Isolation panels, new electrical wiring throughout.
Project Fast Facts
- All new wall finishes, including skim costing of existing walls, new wall protection, bumper guards and crash rails, All new door hardware, New auto operated entry and exit doors with card swipe control, New Nurse Call System, All new data and coax wiring, Skim coat all new walls and install new wall finishes, Install new flooring and millwork, Installation of all new sprinkler piping, Installation of all new med gas piping and retractable gas column. All installed and certified per NFPA code. All new ducting, VAV’s, reheat coils and humidifiers. All new HVAC controls and wiring connected to building automation system, New Precision Air grid system with HEPA filtration, All new flooring, wall protection & millwork, Install new 9000lb RTU on roof. Required additional steel support structure & off hours street closure for crane lift, All new ducting to RTU on roof was double walled, welded stainless steel with insulation between the inner and outer walls, Coordinate installation of all new Surgical lighting system & video recording boom
- Gross Size:3000 ft 2